Street Construction Projects
2025 Street Construction
- East Fountain Street (100 block)
- Washington Street (from W Chapel St to N Bequette)/Johnson St (Washington to 200' North)
2024 Street Construction
- South Linn Street (from E Polk St to Dead End)
- East Polk Street (from S Union to 1 block east)
2023 Street Construction
- West Fountain Street (Lindsey to Iowa Streets)
2022 Street Construction
- West North Street (W Chapel St to N Bequette St)
2021 Street Construction
- Jewett St
- Short St
- W Leffler St
- Dydno St